Free training
Learn the SANS 10400-XA:2026 workflow
Fourteen practical guides take a project from initial setup to a reviewed calculation report. No account is required.These guides explain the software, storey and tenancy workflow, and good data-entry practice. They do not reproduce or replace the official SANS document, product certification or professional review.
Project setup
Create the 2026 calculation record, select the project location and define net floor area by storey and occupancy or tenancy.
Start guideOrientation
Set the building reference direction used to classify openings and solar exposure.
Start guideShading
Assign each opening to its storey and occupancy, then classify it as shaded, unshaded or southern from its orientation and shading geometry.
Start guideFenestration
Build the 2026 opening schedule for windows and doors, assessed independently by storey and occupancy or tenancy.
Start guideRooflights
Record rooflights separately for each roof area, size and performance specification.
Start guideFloors
Define every ground-bearing, suspended envelope or internal suspended floor and assess only the Clause 5.4 checks that apply.
Start guideWalls
Assess each external wall using the correct Clause 5.5 route and retain its construction and boundary evidence.
Start guideRoofs
Model each roof construction separately and calculate its insulation and assembly performance.
Start guideBuilding sealing
Complete the sealing and air-tightness checklist with the applicable Yes or No response and record the proposed sealing method.
Start guideDomestic hot water
Capture the building use, demand assumptions, storage and system efficiency inputs for domestic hot water.
Start guideLighting
Record connected lighting power and the net floor area used to calculate project lighting performance.
Start guideAir-conditioning
List proposed air-conditioning equipment and review capacity and efficiency data by unit.
Start guideU / SHGC designer
Design a multi-pane opening and prepare whole-opening U-value and SHGC data for the fenestration schedule.
Start guideResults and reporting
Review component calculations, resolve outstanding inputs and prepare a detailed project report.
Start guide